NEWOffline-first iOS + Android · ships in May

Audit-ready fire inspections.
Without the paper chase.

Capture evidence offline, generate reports your customers can actually read, and close deficiencies through to reinspection — built for fire-protection contractors who left BuildingReports behind.

Book a 20-min demo
  • NFPA 10 · 25 · 72 templates
  • 90-day pilot · white-glove import
  • Month-to-month
NFPA 10 · MONTHLY · 12 ITEMS
OFFLINEQUEUED · 3
Extinguisher · EX-014
Bay 3 · Tower A · Riverside Plaza
RP
R. Patel · today
88/ 100 audit-ready
4/12 answered·all evidence captured
1
Gauge in operable range
Passed 14:02
PASS
FAIL
N/A
2
Seal & tamper indicator intact
Passed 14:03
PASS
FAIL
N/A
3
No physical damage to cylinder
PASS
FAIL
N/A
Auto-deficiency · DEF-0212
Cylinder body dented
NFPA 10 · §7.2.2 · photo attached
4
Signage visible from 20 ft
Marked N/A
PASS
FAIL
N/A
INSPECTION PROGRESS4 / 12
Save
Sign inspection · 8 left
CRITICALNFPA 10 · §7.2.2
Cylinder body dented — replace unit
EX-014 · Bay 3 · R. Patel · 14 min ago
Photo captured · geo + sha
EX-014-fail-01.heic
Offline · 3 captures queued · syncing when back online
9.4×
faster report turnaround vs spreadsheets
38%
lift in deficiency-quote acceptance
0
missed annual inspections in pilot fleet
4.8/5
tech satisfaction across 12 pilot crews
The four things incumbents got wrong

Built around the parts of inspection day that actually break.

Field capture, evidence, the deliverable, the close-out. Every other feature can wait.

01 · CAPTURE

Offline-first field app

Pass/Fail/N/A taps queue in IndexedDB and auto-flush on reconnect. Photos sync in the background. Your tech keeps moving in a sub-basement with no signal.

  • Native iOS + Android
  • Geo-stamped photos
  • Queue visible to the tech, not buried
02 · EVIDENCE

Audit-ready scoring

Every line item has a required-evidence model: response, asset link, timestamp, photo on Fail. The score updates live so techs see what is missing before they submit.

  • Block-on-submit if photo-required Fail missing
  • NFPA code references on every deficiency
  • Immutable once signed
03 · REPORTS

Readable, branded reports

Two-layer PDFs — a one-page owner summary on top, full asset appendix beneath. Different audience packs for OWNER, AHJ, INSURER, INTERNAL.

  • No more "incomprehensible" deliverables
  • ZIP packets with raw photos for AHJs
  • Your logo, your colors, your terms
04 · CLOSURE

Deficiency-to-reinspection loop

Findings auto-create deficiency rows with severity and code refs. Office converts to a quote; customer approves from the portal; reinspection status rolls up to the building.

  • Quote-ready scope
  • Magic-link customer portal
  • Reinspection cycle time, measured
SEE IT

All four wedges, on one screen.

This is the office view after a tech signs an inspection in the field. Capture happened on a phone with no signal; evidence rolled up live; the report is one click; deficiencies are already in the next inspection. We didn't bolt it on — we built around it.

redtag-itm.app/inspections/brigham-lofts-q2
InspectionsBrigham LoftsQ2 NFPA 25Synced 12s ago
INSPECTIONS · ACTIVE

Brigham Lofts · Q2 NFPA 25

RPMOADJB4 techsSIGNED
487 assets · Patel Fire Protection · 4 techs · sign-off 10:14a today
EVIDENCE SCORE96/100
+4 Q1
ASSETS · 487 TOTAL · 412 INSPECTED
Captured by field team
SYNCED
Wet riser SC-12 — Floor 3PASS
NFPA 25 · 5.2.1 · Hydrostatic OK
9:14a
Sprinkler head SP-3142 — Unit 304FAIL
NFPA 25 · 5.2.1.1 · Glass bulb · corroded
9:22a
3
Fire pump FP-01 — Mech roomPASS
NFPA 25 · 8.3.3 · Weekly churn · 142 psi
9:38a
Standpipe SP-204 — Stair BN/A
NFPA 25 · 6.3 · Hydrostatic skipped
9:41a
FACP-B1 — Lobby panelPASS
NFPA 72 · 14.4.5 · No trouble signals
9:52a
PIV-002 — Riser roomPASS
NFPA 25 · 13.3 · Chained + tagged open
10:04a
DEFICIENCIES
Routed to office queue
3 OPEN
NFPA 25 · 5.2.1.1
42m ago
Corroded sprinkler head
SP-3142 · Unit 304
NFPA 72 · 14.4.5
12m ago
Missing battery test record
FACP-B1 · Lobby
NFPA 25 · 13.3.3.1
2m ago
PIV without supervision
PIV-002 · Riser room
AUDIT TRAIL · 142 EVENTS · LAST EDIT 4M AGO
CONTRACTORS · ABOUT LEGACY VENDORS

Why they're leaving BuildingReports, in their own words.

Read the full side-by-side · vs BuildingReports →
on BuildingReports

incomprehensible to the client

R/FIREALARMS · 4MO
on a legacy ITM tool

faster on pen and paper

R/FIREALARMS · 2MO
on BuildingReports

setting up is a 6-week project

CAPTERRA · 3/5
$149 / TECH / MONTH · NO PER-REPORT FEES · 90-DAY PILOT

Try it on real jobs for 90 days.

We import your CSV, set up your branded reports, and run the first inspection alongside you. No card required until day 30.

$7,672
avg monthly upside · 12-tech crew
5 days
payback period · in month 1
6 days
time to first real inspection
0
per-report fees · ever